
Panel upgrades
Most homes built before 1990 have 100A or 125A service, which can’t support an EV, a pool heater and central AC at once.
- 100A to 200A service upgrades
- Federal Pacific, Zinsco and Challenger panel replacement
- Meter can and mast replacement
- Panel labeling and circuit mapping
TYPICAL COST $2,400–$4,500, PERMIT INCLUDED
SAFETYWe coordinate the FPL disconnect; power is usually off 4–6 hours.
Get a quote



